Hosting | Chicago (DRC) maintenance
Scheduled for Sep 21, 09:00 - 12:00 UTC
Scheduled
Start: 21/09/24, 09:00 UTC
End: 21/09/24, 12:00 UTC
---
During this time period, our Engineering team will be performing maintenance.
IMPACT:
- Network degradation/increased RTT/CCU drops up to 30m in 3h maintenance window during upgrading software
- Besides, no network impact

We apologize for any inconvenience this might cause.
Posted Sep 16, 2024 - 13:31 UTC
This scheduled maintenance affects: Hosting (Chicago (DRC)).